47.

Proposed Refurbishment of existing Oil Fired Boiler of 2x30 MW to Coal Based CFBC Boiler Based Termal Power Plant (TPP)at Chandrapur in Kamrup District, Assam By M/s. Imperial APGCL Power Ltd.

Proposed Refurbishment of existing Oil Fired Boiler of 2x30 MW to Coal Based CFBC Boiler Based Termal Power Plant (TPP)at Chandrapur in Karup District, Assam By M/s. Imperial APGCL Power Ltd.

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available inDC office, Kamrup(M) district, District Industry Centre, Kamrup district, Chandrapur Gaon Panchayat, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, MoEF Regional Office at Shillong,PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

 

Public Hearing to be held at Chandrapur Termal Power Station (CTPS), Guest House, Chnadrapur, Dist-Kamrup, Assam

21-10-2011 at 11:00AM

46.

Proposed Expansion of Integrated Paper Mill (30,000 TPA to 2,00,000 TPA) for manufacturing of writing & printing paper at Jogighopa, Bongaigaon District, Assam by M/s Ashok Paper Mill (Assam) Ltd.

Proposed Expansion of Integrated Paper Mill (30,000 TPA to 2,00,000 TPA) for manufacturing of writing & printing paper at Jogighopa, Bongaigaon District, Assam by M/s Ashok Paper Mill (Assam) Ltd.

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Bongaigaon; District Industry Centre, Bongaigaon district; Jogighopa Gaon Panchayat, Bongaigaon District Assam; Chief Executive Officer, Zilla Parishad, Bongaigaon District, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Bongaigaon & PCBA Head Office, Guwahati.

 

1

Public Hearing to be held at Ashok Paper Mill Campus, Jogighopa, Dist-Bongaigaon, Assam

30-09-2011 at 11:00AM

45.

Proposed Siesmic Survey & Exploratory Drilling Projects of M/s Essar Oil Limited, Mumbai at

 

  1. Siesmic Survey & Exploratory Drilling Project at Block AA-ONN-2004/5, Tinsukia District
   
  2. Siesmic Survey & Exploratory Drilling Project at Block AA-ONN-2004/3, Dhemaji District
   
  3. Siesmic Survey & Exploratory Drilling Project at Block AA-ONN-2004/3, Lakhimpur District

1

Proposed Siesmic Survey & Exploratory Drilling Projects of M/s Essar Oil Limited, Mumbai at Block AA-ONN-2004/5 Tinsukia District, Assam

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Tinsukia; District Industry Centre, Tinsukia district; Buridihing Gaon Panchayat, Tinsukia District Assam; Chief Executive Officer, Zilla Parishad, Tinsukia District, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

2& 3

Proposed Siesmic Survey & Exploratory Drilling Projects of M/s Essar Oil Limited, Mumbai at Block AA-ONN-2004/3 Dhemaji District, Block AA-ONN-2004/3 Lakhimpur District of Assam

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Dhemaji /Lakhimpur district; District Industry Centre, Dhemaji /Lakhimpur district; Dhemaji Town Committee, Dhemaji District /Baginadi Gaon Panchayat, /Lakhimpur District; Chief Executive Officer, Zilla Parishad, Dhemaji /Lakhimpur District, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh and PCBA Regional Office, Tezpur & PCBA Head Office, Guwahati.

 

1

Public Hearing to be held at Balijan High School campus, Balijan, District - Tinsukia, Assam

19-09-2011 at 11:00AM

2

Public Hearing to be held at Dhemaji Town Committee Auditorium District - Dhemaji, Assam

22-09-2011 at 11:00AM

3

Public Hearing to be held at Baginadi Higher Secondary School, Baginadi, District - Lakhimpur, Assam

23-09-2011 at 11:00AM

44.

Proposed Expansion Project of Cement Manufacturing Unit at Village-Bokajan, District-Karbi Anglong District, Assam by M/s. Cement Corporation of India Ltd.

Proposed Expansion Projects of Cement Manufacturing Unit from production capacity of 600TPD to 1200TPD by M/s Cement Corporation of India Ltd. at village-Bokajani, Karbi Anglong District Assam.

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Karbi Anglong district; District Industry Centre, Karbi Anglong district; Bokajan Town Committee, Karbi Anglong District Assam; Chief Executive Officer, Zilla Parishad, Diphu, Karbi Anglong District, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

EIA Report , EIA Annexure

Public Hearing to be held at Bidya Sagar High School, P.O.-Bokajan, District -Karbi Anglong, Assam

08-09-2011 at 11:00AM

43.

Proposed Exploration and Production of Coal Bed Methane (CBM) in AS-CBM-2008/IV(Assam) Block at Village-Likhapani, Tehsil-Margherita, District-Tinsukia, Assam by M/s. DART Energy (AS) Pte. Ltd.

 

Proposed Projects of M/s DART Energy (AS) Pte. Ltd., Village-Likhapani, Tehsil-Margherita, Tinsukia District Assam.

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Tinsukia district; District Industry Centre, Tinsukia district; Lekhapani Gaon Panchayat, , Dibrugarh District Assam; Chief Executive Officer, Zilla Parishad, Tinsukia, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Minutes of Public Hearing is available in DC office, Tinsukia district; District Industry Centre, Tinsukia district; Lekhapani Gaon Panchayat, , Dibrugarh District Assam; Chief Executive Officer, Zilla Parishad, Tinsukia, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

1

Public Hearing to be held at Sarvodaya Hindi High School, Udaypur, Lekhapani, District -Tinsukia, Assam

29-08-2011 at 11:00AM

   
42.

1. Gas Field development in Tengakhat-Naharkatia-Jorajan area

 

   
  2. Gas Field development in Dumduma-Pengeri area.
   
  3. Gas Field developemnt in Tinsukia-Dhola area.

Proposed Projects of M/s Oil India Ltd., Duliajan, Dibrugarh District Assam.

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Dibrugarh/Tinsukia district; District Industry Centre, Dibrugarh district; Rongagora/Chiringghola/Hapjan Gaon Panchayat, , Dibrugarh/Tinsukia District Assam; Chief Executive Officer, Zilla Parishad, Dibrugarh/Tinsukia, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Minutes of Public Hearing dated 23-08-2011 ,25-08-2011, 26-08-2011 is available in DC office, Dibrugarh/Tinsukia district; District Industry Centre, Dibrugarh district; Rongagora/Chiringghola/Hapjan Gaon Panchayat, , Dibrugarh/Tinsukia District Assam; Chief Executive Officer, Zilla Parishad, Dibrugarh/Tinsukia, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

1

Public Hearing to be held at Purbanchal Karikari H. S. School, Rongagora, Ushapur, Duliajan, District -Dibrugarh, Assam

23-08-2011 at 11:00AM

2

Public Hearing to be held at Chachaji High School, Bosapathar, Lahoal, District - Dibrugarh, Assam

25-08-2011 at 11:00AM

3

Public Hearing to be held at Hapjan High School, Borhapjan, District - Tinsukia, Assam

26-08-2011 at 11:00AM

41. Naphtha Spillter Unit(160000TPA) & Wax Unit to produce 43300TPA of Paraffin Wax and 4,500TPA of SemiMicrocrystalline Project of M/s. Numaligarh Refinery Ltd.

a) Proposed Naphtha Units (160,000TPA) of Petrochemical Grade Naphtha by M/s. Numaligarh Refinery Ltd.    

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Golaghat district; District Industry Centre, Golaghat district; Pangka Gaon Panchayat, PO-Kanaighat, Golaghat District Assam; Chief Executive Officer, Zilla Parishad, Golaghat, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

Cover Page,Index- I, Index II , Chapter-I, Chapter-II Chapter-III(1-58),Chapter-III(59-80),Chapter-III(81-117), Chapter-IV Chapter-VChapter-VI, Annexure

b) Proposed Wax Units to produce 43,300TPA of Paraffin Wax and 4,500TPA of Semi-Microcrystalline Wax    

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Golaghat district; District Industry Centre, Golaghat district; Pangka Gaon Panchayat, PO-Kanaighat, Golaghat District Assam; Chief Executive Officer, Zilla Parishad, Golaghat, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

Cover Page,Index-I, Index - II , Chapter-I, Chapter-II Chapter-III, Chapter-IV Chapter-VChapter-VI, Drawing- Annexure , Plate 2.1

Minutes of Public Hearing is available in DC office, Golaghat district; District Industry Centre, Golaghat district; Pangka Gaon Panchayat, PO-Kanaighat, Golaghat District Assam; Chief Executive Officer, Zilla Parishad, Golaghat, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

14-07-2011 at 11:00AM

(Public Hearing held at Pangka Roopram Hazarika High School, P.O. - Kanaighat, Telgram, District - Golaghat, Assam )

40.

a. Secondary Tank Farm Project in Tengakhat-Nahakatia-Jorajan area Project of M/s.Oil India Ltd., Dulijan, Dibrugarh District, Assam.

 

   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
  b. 3(three) Pipeline Projects in Tinsukia and Dhola area : 37km long 400mm dia Gas Transmission Pipeline from Baghijan to CGGS and OTP near W/50; 45 km long 200mm dia Baghjan STF Crude Oil Pipeline; 23 km long 100mm dia Crude Oil Pipeline from Baghjan to Makum OCS, Project of M/s.Oil India Ltd., Dulijan, Dibrugarh District, Assam.
   

a) Proposed Secondary Tank Farm Project in Tengakhat-Nahakatia-Jorajan area.

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Dibrugarh district; District Industry Centre, Dibrugarh district; Naoholia Gaon Panchayat, , Dibrugarh District Assam; Chief Executive Officer, Zilla Parishad, Dibrugarh, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Cover Page,Acknowledgement,Content, Chapter-1, Chapter-Fig 1.1 Chapter-Fig 1.2,Chapter- fig 1.3, Chapter-2, Chapter-3 Chapter-Fig 3.1Chapter-Fig 3.2,Chapter-Fig 3.3, Chapter-Fig 3.4, Chapter-4 ,Chapter-4 Table 4.1,Chapter-4 Table 4.2,Chapter-4 Table 4.3,Chapter-4 Table 4.5,Chapter-4 Table 4.6,Chapter-4 Table 4.7,Chapter-4 Table 4.8,Chapter-4 Table 4.9,Chapter-4 Table-4.10,Chapter-4 Table 4.11,Chapter-4 Table 4.12,Chapter-4 Table 4.13,Chapter-4 Table 4.14,Chapter-4 Table 4.15-16,Chapter 4 Table 4.17,Chapter 4 Table 4.18,Chapter 4 Table 4.19,Chapter 4 Table 4.20,Chapter 4 Table 4.21-22,Chapter 4 Table 4.23,Chapter 4 U Fig 4.1,Chapter 4 U Fig 4.2,Chapter-5,Chapter-6,Chapter-7,Chapter-7 fig 7.1,Chapter-8, Chapter-8 table 8.1

Minutes of Public Hearing is available in DC office, Dibrugarh district; District Industry Centre, Dibrugarh district; Naoholia Gaon Panchayat, , Dibrugarh District Assam; Chief Executive Officer, Zilla Parishad, Dibrugarh, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

b) Proposed 3(three) Pipeline Projects in Tinsukia and Dhola area : 37km long 400mm dia Gas Transmission Pipeline from Baghijan to CGGS and OTP near W/50; 45 km long 200mm dia Baghjan STF Crude Oil Pipeline; 23 km long 100mm dia Crude Oil Pipeline from Baghjan to Makum OCS.    

  

  Executive Summary (in English)

   Executive Summary (in Assamese)

   EIA Report is available in DC office,Tinsukia district; District Industry Centre, Tinsukia district;Baghajan Gaon Panchayat, Tinsukia District Assam; Chief Executive Officer, Zilla Parishad, Tinsukia, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Cover Page,Acknowledgement,Content, Chapter-1, Chapter-1.1 Chapter-1.2,Chapter-1.3,Chapter-1.4, Chapter-2, Chapter-3, Chapter-4 ,Chapter-4.1,Chapter-4.2,Chapter-4.3,Chapter-4.4,Chapter-4.5,Chapter-4.6,Chapter-4.7,Chapter-4.8,Chapter-4.9,Chapter-4.10,Chapter-4.11,Chapter-4.12,Chapter-4.13,Chapter-4.14,Chapter-4.15,Chapter-4.16,Chapter-4.17,Chapter-4.18,Chapter-4.19,Chapter-4.20,Chapter-4.21,Chapter-4.22,Chapter-5,Chapter-5.1,Chapter-5.2,Chapter-6,Chapter-7,Chapter-7.1,Chapter-8

Minutes of Public Hearing is available in DC office, Tinsukia district; District Industry Centre, Tinsukia district;Baghajan Gaon Panchayat, Tinsukia District Assam; Chief Executive Officer, Zilla Parishad, Tinsukia, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Public Hearing held at Naoholia L. P. School, Naoholia, District -Dibrugarh, Assam

07-07-2011 at 11:00AM

Public Hearing held at Baghjan TE L.P. School, District - Tinsukia, Assam

08-07-2011 at 11:00AM

39. Pulp Plant (250TPD), Paper Plant (250TPD) & 10MW Cogeneration Power Plant at Industrial Growth Center, Matia, District - Goalpara, Assam by M/s Kohinoor Pulp & Paper Pvt. Ltd.(K.P.P.P.L).

a) Proposed Pulp Plant (250TPD), Paper Plant (250TPD) & 10MW Cogeneration Power Plant atIndustrial Growth Center, Matia, District - Goalpara, Assam by M/s Kohinoor Pulp & Paper Pvt. Ltd.(K.P.P.P.L).    

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

  EIA Report is available in DC office, Goalpara district, District Industry Centre, Goalpara district, Mornai Gaon Panchayat, Chief Executive Officer, Zilla Parishad, Goalpara, Assam, MoEF Regional Office at Shillong,PCBA Regional Lab-cum-Office, Bongaigaon & PCBA Head Office, Guwahati.

Cover Page,Content, Chapter-I, Chapter-II Chapter-III, Chapter-IV Chapter-VChapter-VI, Chapter-VII,Chapter-VIII, Chapter-IX, Chapter-X

Minutes of Public Hearing is available in DC office, Goalpara district, District Industry Centre, Goalpara district, Mornai Gaon Panchayat, Chief Executive Officer, Zilla Parishad, Goalpara, Assam, MoEF Regional Office at Shillong,PCBA Regional Lab-cum-Office, Bongaigaon & PCBA Head Office, Guwahati.

20-05-2011 at 11:00AM

(Public Hearing held at Sardar Ballav Bhai Patel High School, Marnoi, Goalpara, Assam )

38. Cement Plant (600 TPD) at dag No. 85 & 86 of K. P. Patta No. 31, Village- Sarutari, Mouza - Sonapur, District - Kamrup(M), Assam by M/s GMG Cement Industries.

a) Proposed Cement Plant (600 TPD) at dag No. 85 & 86, K. P. Patta Assam by M/s GMG Cement Industries.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

  EIA Report is available in DC office, Kamrup(M) district, District Industry Centre, Kamrup district, 57 No. Barkhat Gaon Panchayat, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, MoEF Regional Office at Shillong,PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

Cover Page,Frontpage, PrefaceIndex, Chapter-I, Chapter-II Chapter-III, Chapter-IV Chapter-VChapter-VI, Chapter-VII,Chapter-VIII

Minutes of Public Hearing is available in DC office, Kamrup(M) district, District Industry Centre, Kamrup district, 57 No. Barkhat Gaon Panchayat, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, MoEF Regional Office at Shillong,PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

03-03-2011 at 11:00AM

(Public Hearing held at Open space in front of M/s Balaji Silicate Industies, Vill- Sarutari, Byrnihat, District - Kamrup, Assam )

37. Naphtha Spillter Unit(160000TPA) & Wax Unit to produce 43300TPA of Paraffin Wax and 4,500TPA of SemiMicrocrystalline Project of M/s. Numaligarh Refinery Ltd.

a) Proposed Naphtha Units (160,000TPA) of Petrochemical Grade Naphtha by M/s. Numaligarh Refinery Ltd.    

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Golaghat district; District Industry Centre, Golaghat district; Pangka Gaon Panchayat, PO-Kanaighat, Golaghat District Assam; Chief Executive Officer, Zilla Parishad, Golaghat, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

Cover Page,Index- I, Index II , Chapter-I, Chapter-II Chapter-III(1-58),Chapter-III(59-80),Chapter-III(81-117), Chapter-IV Chapter-VChapter-VI, Annexure

b) Proposed Wax Units to produce 43,300TPA of Paraffin Wax and 4,500TPA of Semi-Microcrystalline Wax    

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Golaghat district; District Industry Centre, Golaghat district; Pangka Gaon Panchayat, PO-Kanaighat, Golaghat District Assam; Chief Executive Officer, Zilla Parishad, Golaghat, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

Cover Page,Index-I, Index - II , Chapter-I, Chapter-II Chapter-III, Chapter-IV Chapter-VChapter-VI, Drawing- Annexure , Plate 2.1

14-02-2011 at 2:00PM

(Public Hearing held at Pangka Rupam Hazarika High School, P.O. - Kanaighat, Telgram, District - Golaghat, Assam )

36. Cement Manufacturing Units (360 TPD) at dag No. 87, K. P. Patta No. 40, Village- Kisam 48 No. Block, Mouza - Jamunamukh, District - Nagaon, Assam by M/s Rudradev Cement Pvt. Ltd.

a) Proposed Cement Manufacturing Units (360 TPD) at dag No. 87, K. P. Patta Assam by M/s Rudradev Cement Pvt. Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Nagaon district; District Industry Centre, Nagaon district; Bheloguri Gaon Panchayat, Nagaon, Assam; Chief Executive Officer, Zilla Parishad,Nagaon, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

Cover Page,Frontpage, PrefaceIndex, Chapter-I, Chapter-II Chapter-III, Chapter-IV Chapter-VChapter-VI, Chapter-VII,Chapter-VIII, Annexure

Minutes of Public Hearing is available in DC office, Nagaon district; District Industry Centre, Nagaon district; Bheloguri Gaon Panchayat, Nagaon, Assam; Chief Executive Officer, Zilla Parishad,Nagaon, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

14-02-2011 at 11:00AM

(Public Hearing held at Khakanjuri Prathamik Bidyalay, Village - Khakanjuri, P.O. - Moderbheta, District - Nagaon, Assam )

35. Expansion of Billet Manufacturing Unit (66,000 MTPA) to 150,000 MTPA) with Captive Power Plant (10MW)

a) Proposed Expansion of Billet Manufacturing Unit (66,000MTPA to 150,000 MTPA) with Captive Power Plant (10MW) at Dag No. 144, Patta No.16, Mouza-Sila Sendurighopa, Village Mahekhaiti, Amingaon, District-Kamrup, Assam by M/s. Brahmaputra TMT Bars Pvt. Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Kamrup district (Rural); District Industry Centre, Kamrup district; Bezera Anchalik Panchayat, Bezera, Kamrup, Assam; Chief Executive Officer, Zilla Parishad, Kamrup, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

Minutes of Public Hearing is available in DC office, Kamrup district (Rural); District Industry Centre, Kamrup district; Bezera Anchalik Panchayat, Bezera, Kamrup, Assam; Chief Executive Officer, Zilla Parishad, Kamrup, Assam; MoEF Regional Office at Shillong; PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

14-12-2010 at 11:00AM

(Public Hearing held at open space in front of M/s. Brahmaputra TMT Bars Pvt. Ltd., Mouza-Sila Sendurighopa, Village Mahekhaiti, Amingaon, District-Kamrup, Assam )

34. Expansion of Cement Plant (Cement 550 TPD PPC TO 1100 TPD PSC & PPC) and Clinker (400 TPD TO 700 TPD) at Village Sarutari, Tehsil Sonapur, Byrnihat, District Kamrup, Assam

a) Proposed Expansion of Cement Plant (Cement 550 TPD PPC TO 1100 TPD PSC & PPC) and Clinker (400 TPD TO 700 TPD) at Village Sarutari, Tehsil Sonapur, Byrnihat, District Kamrup, Assam by M/s Purbanchal Cement Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Kamrup district (Rural), District Industry Centre, Kamrup district, Town Committee, Vijaynagar, Kamrup, Assam, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, MoEF Regional Office at Shillong,PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

Minutes of Public Hearing is available in DC office, Kamrup district (Rural), District Industry Centre, Kamrup district, Town Committee, Vijaynagar, Kamrup, Assam, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, MoEF Regional Office at Shillong,PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

01-11-2010 at 11:00AM

( Public Hearing held at Tamulikuchi High School, Vill - Sarutari, 14th Mile, Byrnihat Kamrup)

 

33. Cement Plant for Manufacture of Ordinary Portland Cement (OPC) and Portland Pozzolana Cement (PPC) and Cement Clinker for the capacity of 0.66 million TPA (2000 TPD)

a) Proposed Cement Plant for Manufacture of Ordinary Portland Cement (OPC) and Portland Pozzolana Cement (PPC) and Cement Clinker for the capacity of 0.66 million TPA (2000 TPD) production at Jhoombasti, Debendra nagar in Badarpurghat tahsil of Karimganj district of Assam by M/s. Valley Strong Cement (Assam) Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)   Executive Summary (in Bengali)

 

   EIA Report is available in DC office, Karimganj, District Industry Centre, Karimganj district, President Gaon Panchayat, Bundashil under Badarpur Anchalik Panchayat, Karimganj District, Zilla ParishadOffice, Karimganj district, MoEF Regional Office at Shillong, PCBA Regional Lab-cum-Office, Silchar & PCBA Head Office, Guwahati.

Cover Page, Contents,Chapter-IChapter-II,Chapter-III, Chapter-IVChapter-V, Chapter-VI Chapter-VIIChapter-VIII,Chapter-IX,Annexure-III(I),Annexure-III(II),Annexure-III(III),Annexure-III(IV),Annexure-III(V)P(I) , Annexure-III(V)P(2)

Minutes of Public Hearing is available in DC office, Karimganj, District Industry Centre, Karimganj district, President Gaon Panchayat, Bundashil under Badarpur Anchalik Panchayat, Karimganj District, Zilla ParishadOffice, Karimganj district, MoEF Regional Office at Shillong, PCBA Regional Lab-cum-Office, Silchar & PCBA Head Office, Guwahati.

06-09-2010 at 11:00 A.M.

(Public Hearing held at Vivekananda Kendra Vidyalaya, Debendra Nagar, PO: Badarpurghat, Dist-Karimganj, Assam)

 

 

32. Drilling under Murkongselek at MSD

a) Proposed Drilling under Murkongselek at MSD by M/s. Oil India Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

  

   EIA Report is available in DC office, Dhemaji, District Industry Centre, Dhemaji district, Jonai Town Committee, Dhemaji, Zilla ParishadOffice, Dhemaji district, MoEF Regional Office at Shillong, PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Cover Page, Contents, Baseline Study1Baseline Study2,Baseline Study3Baseline Study4,Baseline Study5,Baseline Study6Baseline Study7Baseline Study8, Baseline Study9,

Drilling ProgrammeEIAEMP, Conclusion, References, AppendicesGlossary Terms

Minutes of Public Hearing dtd. 29-05-2010 is available in DC office, Dhemaji, District Industry Centre, Dhemaji district, Jonai Town Committee, Dhemaji, Zilla ParishadOffice, Dhemaji district, MoEF Regional Office at Shillong, PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

29-05-2010 at 11:00 A.M.

(Public Hearing held at Rukmini Ali ME School for MSD Jonai, Dhemaji District, Assam)

 

 

31. 45 KLPD Distillery unit at Khatkhati, Block Bokajan, District Karbi Anglong (Assam) by M/s. Radiant Manufacturers Pvt. Ltd.

a) Proposed 45 KLPD Distillery unit at Khatkhati, Block Bokajan, District Karbi Anglong (Assam) by M/s. Radiant Manufacturers Pvt. Ltd.    

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Radiant Manufacturers Pvt. Ltd.

   EIA Report is available in DC office, Karbi Anglong, District Industry Centre, Diphu Karbi Anglong district, Town Committee, Bokajan,Karbi Anglong district, Zilla Parishad Office, Karbi Anglong district, MoEF Regional Office at Shillong, PCBA Regional Office, Golaghat & PCBA Head Office, Guwahati.

Front Page Index, Acknowledgement, Chapter-IChapter-II,Chapter-III, Chapter-IV, Chapter-V Ambient Air Quality Data

17-02-2010 at 11:00 A.M.

(Public Hearing held at Khatkhari Hindi L.P. School, PO -Khatkhati, Bokajan, Assam)

30. Drilling under Murkongselek at MSC & MSD

a) Proposed Drilling under Murkongselek at MSC & MSD by M/s. Oil India Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Oil India Ltd.

   EIA Report is available in DC office, Dhemaji, District Industry Centre, Dhemaji district, Jonai Town Committee, Dhemaji, Zilla ParishadOffice, Dhemaji district, MoEF Regional Office at Shillong, PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Cover Page, Contents, Baseline Study1Baseline Study2,Baseline Study3Baseline Study4,Baseline Study5,Baseline Study6Baseline Study7Baseline Study8, Baseline Study9,

Drilling ProgrammeEIAEMP, Conclusion, References, AppendicesGlossary Terms

Minutes of Public Hearing dtd. 10-02-2010 is available in DC office, Dhemaji, District Industry Centre, Dhemaji district, Jonai Town Committee, Dhemaji, Zilla ParishadOffice, Dhemaji district, MoEF Regional Office at Shillong, PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

09-02-2010 at 11:00 A.M.

(Public Hearing did not held for MSD Jonai, Dhemaji District, Assam)

 

10-02-2010 at 11:00 A.M.

(Public Hearing held at Tari Bijoypur for MSC Jonai, Dhemaji District, Assam)

 

29. Open Cast Project (0.25 MTPA) at Lekhapani under Tinsukia district, Assam by M/s Coal India Limited (North Eastern Coalfields), Margherita, Assam

a) Proposed Open Cast Project (0.25 MTPA) at Lekhapani under Tinsukia district, Assam by M/s Coal India Limited (North Eastern Coalfields), Margherita, Assam.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s Coal India Limited (North Eastern Coalfields), Margherita, Assam.

   EIA Report is available in DC office, Tinsukia district,  9 Zila Parishad Committee Jagun, District Industry Centre, Lekhapani Gaon Panchayat, MoEF Regional Office at Shillong, Dibrugarh regional office of the Board, PCBA Head Office, Guwahati..

Cover Page Contents, Chapter-IChapter-II,Chapter-III(I),Chapter-III(II),Chapter-III(III),Chapter-III(IV), Chapter-IV(I),Chapter-IV(II), Chapter-V, Chapter-VI Chapter-VIIChapter-VIII,Chapter-IX,Chapter-X,Chapter-XI,Chapter-XII

Minutes of Public Hearing dtd. 14-10-09 is available in DC office, Tinsukia district,  9 Zila Parishad Committee Jagun, District Industry Centre, Lekhapani Gaon Panchayat, MoEF Regional Office at Shillong, Dibrugarh regional office of the Board, PCBA Head Office, Guwahati

14-10-2009 at 11:00AM

(Public Hearing held at Lekhapani Forest IB, Lekhapani, Tinsukia, Assam)

28. 200KLPD Grain Based Distillery, 15KLPD Malt Spirit, Bottling of IMFL, Country Liquor and 10MW Co-generation Power Plant at Village-Bartezpur, P.O.-Vijaynagar, District-Kamrup(Assam)

a) Proposed 200KLPD Grain Based Distillery, 15KLPD Malt Spirit, Bottling of IMFL, Country Liquor and 10MW Co-generation Power Plant by M/s NV Distilleries & Breweries (North East) Pvt. Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s NV Distilleries & Breweries (North East) Pvt. Ltd.

   EIA Report is available in DC office, Kamrup district (Rural), District Industry Centre, Kamrup district, Town Committee, Vijaynagar, Kamrup, Assam, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, MoEF Regional Office at Shillong,PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

Cover Page & Contents, Chapter-IChapter-II,Chapter-III, Chapter-IV, Chapter-V, Chapter-VI Chapter-VIIChapter-VIII,Chapter-IX, Annexure I,AnnexureII,Location

Minutes of Public Hearing dtd. 15-09-09 is available in DC office, Kamrup district (Rural), District Industry Centre, Kamrup district, Town Committee, Vijaynagar, Kamrup, Assam, Chief Executive Officer, Zilla Parishad, Kamrup, Assam, PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

15-09-2009 at 11:00AM

( Public Hearing held at Proposed project site at Dag No. 20, 21 & 747 of No. 1 Tezpur village, P.O. Rampur, Mouza-Rampur, District-Kamrup, Assam)

27. Ropway Project between Guwahat and North Guwahati

a) Proposed Ropway Project between Guwahati and North Guwahati by Guwahati Metropolitan Development Authority.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by Guwahati Metropolitan Development Authority.

   EIA Report is available in DC office, Kamrup district (Metro), District Industry Centre, Kamrup district, Town Committee, North Guwahati, Guwahati Municipal Corporation, Guwahati-1,Guwahati Metropolitan Development Authority, Guwahat-5, MoEF Regional Office at Shillong, PCBA Head Office, Bamunimaidam, Guwahati-21.

Minutes of Public Hearing dtd. 26-08-09 is available in DC office, Kamrup district (Metro), District Industry Centre, Kamrup district, Town Committee, North Guwahati, Guwahati Municipal Corporation, Guwahati-1,Guwahati Metropolitan Development Authority, Guwahat-5, PCBA Regional Office, Bamunimaidam, Guwahati-21.

25-08-2009

( Public Hearing held at Circuit House, Kamrup (Metro) District Panbazar, Guwahati-1)

26-08-2009

(Town Committee Hall, North Guwahati, Kamrup (Metro) District)

 

26. Drilling under Murkongselek at MSC & MSD

a) Proposed Drilling under Murkongselek at MSC & MSD by M/s. Oil India Ltd.   

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Oil India Ltd.

   EIA Report is available in DC office, Dhemaji, District Industry Centre, Dhemaji district, Jonai Town Committee, Dhemaji, Zilla ParishadOffice, Dhemaji district, MoEF Regional Office at Shillong, PCBA Regional Office, Dibrugarh & PCBA Head Office, Guwahati.

Cover Page, Contents, Baseline Study1Baseline Study2,Baseline Study3Baseline Study4,Baseline Study5,Baseline Study6Baseline Study7Baseline Study8, Baseline Study9,

Drilling ProgrammeEIAEMP, Conclusion, References, AppendicesGlossary Terms

16-06-2009

(Posponed)

25. Mini Cement Manufacturing Unit (200 TPD) at Byrnihat, Sonapur

a) Proposed Mini Cement Manufacturing Unit (200 TPD) at Sarutari Village,Byrnihat Industrial area, Sonapur Circle, Kamrup(M) distict, Assam by M/s. Vinayak Cements Ltd.

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Vinayak Cements Ltd.

   EIA Report is available in DC office, Kamrup (M), District Industry Centre, Kamrup district, 55th Kamarkuchi Gaon Panchayat, Kamrup, Circle Office, Sonapur, Kamrup, Zilla Parishad,Kamrup district, MoEF Regional Office at Shillong, PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

11-05-2009

(Public Hearing held at factory Premises at Sarutari Village, Byrnihat Industrial area, Dist-Kamrup)

24. 200 TPD Cement Manufacturing Plant at Byrnihat, Sonapur

a) Proposed Cement Manufacturing Plant (200 TPD) at 15th Mile, GS Road, NH-40, Vill-Byrnihat, Sonapur, Kamrup distict, Assam by M/s. Shivshakti Cements.

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Shivshakti Cements.

   EIA Report is available in DC office, Kamrup (M), District Industry Centre, Kamrup district, 55th Kamarkuchi Gaon Panchayat, Kamrup, Circle Office, Sonapur, Kamrup, Zilla Parishad,Kamrup district, MoEF Regional Office at Shillong, PCBA Regional Office, Guwahati & PCBA Head Office, Guwahati.

07-05-2009

(Public Hearing held at Suru Tandu LP School, Vill-Tandu, Byrnihat, Dist-Kamrup)

23. 200 TPD VSK Cement Plant at Nagaon

a) Proposed 200 TPD VSK Cement Plant at Nagaon distict, Assam by M/s. Mahabali Cements Ltd.

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Mahabali Cements Ltd.

   EIA Report is available in DC office, Nagaon, District Industry Centre, Nagaon district, Changmaji Gaon Panchayat, Nagaon, Doboka Town Committee, Nagaon, Zilla Parishad,Nagaon district, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati.

05-05-2009

(Public Hearing held at Proposed Factory Premises at Modertuli, Doboka, Nagaon)

22. Manufacturing of Asbestos Cement Sheets at Changsari, Kamrup.

a) Proposed Manufacturing of Asbestos Cement Sheets at Changsari, Vill- Silla, Dist-Kamrup by M/s. Jumbo Roofings & Tiles.

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Jumbo Roofings & Tiles.

   EIA Report is available in DC office, Kamrup (Rural), District Industry Centre, Kamrup district, Dhopatari Gaon Panchayat, Kamrup, Circle Officer, North Guwahati, Kamrup district,Zilla Parishad,Kamrup district, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati.

02-05-2009

(Public Hearing held at Ganesh Mandir L. P. School, Vill- Silla, Haluguri Chowk, Changsari, Kamrup)

21. Exploratory Drilling Project in Block AA-ONN-2004/1

a) Proposed Exploratory Drilling Project in Block AA-ONN-2004/1 at Mazgaon and Mora Bazar area of Amguri Block by M/s. Oil India Ltd.

   Executive Summary (in English)

   Executive Summary (in Assamese)

   Application form submitted by M/s. Oil India Ltd.(AMG1, AMG2, AMG3&4)

   EIA Report is available in DC office, Sivasagar, District Industry Centre, Sivasagar district, Amguri Town Committee,Zilla Parishad,Sivasagar district, MoEF Regional Office at Shillong, Regional Lab-cum-Office of the Board at Sivasagar, PCBA Head Office, Guwahati.

Cover Page & Contents, Chapter-IChapter-II,Chapter-III, Diagram_Chapter-III, Chapter-IV, Chapter-V, Chapter-VI Chapter-VIIChapter-VIII, Appendix

Minutes of Public Hearing dtd. 10-09-2008 is available in DC office, Sivasagar, District Industry Centre, Sivasagar district, Amguri Town Committee,Zilla Parishad,Sivasagar district, MoEF Regional Office at Shillong, Regional Lab-cum-Office of the Board at Sivasagar, PCBA Head Office, Guwahati.

10-09-2008

(Public Hearing held at Amguri Natya Mandir, Amguri, Sivasagar, Assam)

20.
Oil & Gas Exploration & Drilling Project in Block AA-ONN-2004/4

a) Proposed Oil & Gas Exploration & Drilling Project in Block AA-ONN-2004/4 by M/s. NAFTOGAZ India Pvt. Ltd.

     Executive Summary (in English)

     Executive Summary (in Assamese)

     Application form submitted by M/s. NAFTOGAZ India Pvt. Ltd.

     EIA Report is available in DC office, Tinsukia, District Industry Centre, Tinsukia district, Margherita Town Committee, Makumpather/Powai/ Ketetong/ Inthem/Kumchai Gaon Panchayat, Zilla Parishad, MoEF Regional Office at Shillong, Regional Office Dibrugarh of the Board, PCBA Head Office, Guwahati.

Cover Page, ContentsChapter-IChapter-II, Chapter-IIIChapter-IV, Chapter-V, Chapter-VIChapter-VIIChapter-VIII, Chapter-IX

Minutes of Public Hearing dtd. 08-08-2008 is available in DC office, Tinsukia, District Industry Centre, Tinsukia district, Margherita Town Committee, Makumpather/Powai/ Ketetong/ Inthem/Kumchai Gaon Panchayat, Zilla Parishad, MoEF Regional Office at Shillong, Regional Office Dibrugarh of the Board, PCBA Head Office, Guwahati.

08-08-2008

(Public Hearing held at Marwari Bibah Bhawan, Thana Road, Margherita, Tinsukia, Assam)

19. Integrated Solid Waste Management Project

a) Integrated Solid waste Management Project of Guwahati Municipal Corporation

     Executive Summary (in English)

     Executive Summary (in Assamese)

     Application form submitted by Guwahati Municipal Corporation

     EIA Report is available in DC office, Kamrup (Metro), District Industry Centre, Kamrup district, Guwahati Metropolitan Development Authority, Guwahati Municipal Corporation, MoEF Regional Office at Shillong, PCBA Regional Office, Guwahati, PCBA Head Office, Guwahati.

Minutes of Public Hearing dtd. 28-07-2008 is available in DC office, Kamrup (Metro), District Industry Centre, Kamrup district, Guwahati Metropolitan Development Authority, MoEF Regional Office at Shillong, PCBA Regional Office, Guwahati, PCBA Head Office, Guwahati.

28-07-2008

(Public Hearing held at Bansi Gopal Namghar (Krishna Mandir), Opp. Pashim Boragaon Kalyankami Mahila Samity, Boragaon Chowk, Pashim Boragaon, Guwahati)

18. Open Cast Project at Ledo & Tikak

a) Tikak Extension Open Cast Project (0.20 MTY) of M/s. Coal India  Limited (North Eastern Coalfields).

     Executive Summary (in English)

     Executive Summary (in Assamese)

     Application form submitted by M/s. Coal India Ltd. 

     EIA Report is available in DC office, Tinsukia district,  Zila Parishad Office, District Industry Centre, Ledo Gaon Panchayat, Margherita Town Committee, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati.

Cover Page, ContentsChapter-IChapter-II

Chapter-IIIChapter-IV(i)Chapter-IV(ii), Chapter-V

Chapter-VIChapter-VIIChapter-VIII, Chapter-IX,  Chapter-XChapter-XI, Chapter-XII

Minutes of Public Hearing dtd. 09-05-08 is available in DC office, Tinsukia district,  Zila Parishad Office, District Industry Centre, Ledo Gaon Panchayat, Margherita Town Committee, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati & Regional Office, Dibrugarh.

09-05-2008

 

(Public Hearing 

held at Ledo Railway Club, Ledo, Assam)

b) Ledo Open Cast Project (0.15 MTY) of M/s. Coal India Limited (North Eastern Coalfields).

     Executive Summary (in English)

     Executive Summary (in Assamese)

     Application form submitted by M/s. Coal India Ltd. 

     EIA Report is available in DC office, Tinsukia district,  Zila Parishad Office, District Industry Centre, Ledo Gaon Panchayat, Margherita Town Committee, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati.

Cover Page, Chapter-IChapter-II

Chapter-III(i)Chapter-III(ii), Chapter-III(iii), Chapter-III(iv)Chapter-IV(i)Chapter-IV(ii), Chapter-V

Chapter-VIChapter-VIIChapter-VIII, Chapter-IX,  Chapter-XChapter-XIChapter-XII

Minutes of Public Hearing dtd. 10-05-08 is available in DC office, Tinsukia district,  Zila Parishad Office, District Industry Centre, Ledo Gaon Panchayat, Margherita Town Committee, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati & Regional Office, Dibrugarh.

10-05-2008

 

(Public Hearing 

held at Ledo Railway Club, Ledo, Assam)

17.

200 TPD 

Mini Cement 

Plant at Koraigaon village, Silasundarighopa Mouza, Kamalpur Revenue Circle Kamrup district

a) Mini Cement Plant

     Project of M/s. Raksha Cement (P) Ltd.

     Executive Summary (in English)

30-04-2008

(Public Hearing held at proposed Factory Premises at Koraibari, Changsari, Kamrup Assam)

b) Mini Cement Plant

     Project of M/s. Raksha Cement (P) Ltd.

     Executive Summary (in Assamese)

Executive Summary is available in DC office, Kamrup district (Rural),  Zila Parishad Office, District Industry Centre, Saraighat Gaon Panchayat, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati.

c) Application form submitted by M/s. Raksha Cement (P) Ltd.
d) EIA Report is available in DC office, DC office, Kamrup district (Rural),  Zila Parishad Office, District Industry Centre, Saraighat Gaon Panchayat, MoEF Regional Office at Shillong, PCBA Head Office, Guwahati.